Issue · IUP case
Status: active · May 12, 2022 — Mar 10, 2026
The operation must be limited to two UPS or truck deliveries per week.
“Two UPS or truck deliveries per week; e”
Before a Certificate of Occupancy is issued, the escrow balance must be paid.
“The Hammerhead on the shared driveway, the escrow balance to be paid”
The Final Plat approval is contingent on the Houghs deeding the westerly 33 feet to complete the full 66-foot right-of-way width for Coquina Street NW.
“The Final Plat could not be approved until the Hough's deeded the westerly 33 feet for the full 66 foot ROW width”
Outdoor storage on the site must be limited to a maximum size of three acres.
“limits outdoor storage to Three (3) Acres maximum size”
The City Engineer recommends approving the plat only if two changes noted in the 3/9/22 memo are made.
“recommended approval of the plat subject to two changes noted in the 3/9/22 memo.”
The excavating business operating under the conditional use permit must limit hours to 6:30 am to 8:00 pm seven days a week.
“Hours to be 6:30 am to 8:00 pm seven days a week;”
The operation must be limited to three full-time employees and two part-time employees who pick up trucks/equipment.
“Three full-time employees, two part-time that pickup trucks/equipment;”
The operation must have no customers, clients, or business-related visitors in a typical week.
“No customers, clients or business-related visitors in a typical week;”
Outdoor storage is allowed only in the winter and must be parked behind the barn.
“Outside storage only in the winter and then parked behind the barn;”
Any other business conducted on the property beyond what is stated requires re-opening the conditional use permit.
“Any other business conducted on this property, other than what is stated at this time, requires the re-opening of the Conditional Use Permit;”
The conditional use permit may be revoked for non-compliance with conditions after notice and hearing.
“A Conditional Use Permit may be revoked if there is a showing of non-compliance of conditions, after notice and hearing.”
If the property is developed, a fence at least 6 feet high and 350 feet long must be installed along the north property line.
“requires a 6' minimum height fence 350' long along the north property line if the property is developed.”
Business operating hours must be 6:30 am to 8:00 pm, seven days a week.
“Hours to be 6:30 am to 8:00 pm seven days a week;”
Extended Home may operate only from 6:30 a.m. to 8:00 p.m., seven days a week.
“Hours 6:30 a.m. to 8:00 p.m. seven days a week;”
Extended Home may store equipment outside only in winter, and it must be parked behind the barn.
“Outside storage only in the winter and then parked behind the barn;”
Before a Certificate of Occupancy is issued, the hammerhead on the shared driveway must be completed.
“The Hammerhead on the shared driveway, the escrow balance to be paid”
Before a Certificate of Occupancy is issued, wetland buffer signs must be installed.
“escrow balance to be paid, wetland buffer signs to be put up, and the shared driveway”
The shared driveway in the Coquina Street NW right-of-way must be constructed to meet City Code Section 10-3-3 street base and subbase requirements, be at least 20 feet wide, comply with State Fire Code access standards for three or more residences, and include a 66-foot cul-de-sac as shown on the Preliminary Plat Exhibit B.
“That shared driveway "shall be constructed to meet street base and subbase requirements required by Section 10-3-3 of the City Code and shall be constructed at a minimum width of t…”
The agreement must run with the land and bind the parties’ representatives, heirs, successors, and assigns.
“This Agreement shall run with the land and be binding upon and extend to the representatives, heirs, successors and assigns of the parties hereto.”