Conditions imposed on this issue (80)
The driveway on CSAH 24 should be located within 30 feet of the west property lot line unless an engineering justification prevents that location.
Nowthen PasturesAny utility relocation within the CSAH 24 or CSAH 5 right-of-way must be coordinated directly by the city/developer.
Nowthen PasturesThe project must provide park dedication for the plat, to be calculated when the development agreement is executed.
Nowthen PasturesNo plantings or private signs are allowed within the county right-of-way.
Nowthen PasturesThe final plat for Nowthen Pastures is approved only if an executed developer’s agreement is completed.
Nowthen PasturesThe plat must dedicate an additional 10 feet of right-of-way along CSAH 24 for future reconstruction purposes.
Nowthen PasturesNo plantings or private signs are permitted within the county right-of-way.
Nowthen PasturesBefore the City releases the financial security, the required items in the Development Agreement for Nowthen Pastures must be completed.
Nowthen PasturesThe development agreement for Nowthen Pastures must include financial security (typically a letter of credit from an FDIC-insured bank) that the City can use if the developer defaults.
Nowthen PasturesThe final plat for Nowthen Pastures is approved only after an executed developer’s agreement is in place.
Nowthen PasturesConstruct improvements in substantial conformance with the site plans as revised to meet the Staff and County memos’ requirements.
Nowthen PasturesProvide financial security, in a form approved by the City Attorney and amount approved by the City Engineer, before the final plat is released for recording, with amount specified in the Developer’s Agreement.
Nowthen PasturesAny existing driveways and field entrances must be removed and the ditch restored to match existing depth, slope, and grades.
Nowthen PasturesNo plantings or private signs are allowed within the county right-of-way, and private improvements outside the right-of-way must not create sight obstructions.
Nowthen PasturesInstall City-approved signage along lot lines or corners adjacent to storm ponds, wetlands, and conservation areas.
Nowthen PasturesThe preliminary plat approval is subject to the Findings of Fact and Record of Decision in Exhibit A.
Nowthen PasturesThe plat must dedicate an additional 10 feet of right-of-way along CSAH 24 for future reconstruction (60 feet total south of the CSAH 24 centerline).
Nowthen PasturesThe culvert requirement must be completed at final plat for the Nowthen Pastures project.
Nowthen PasturesWetland buffer monumentation must be installed per City requirements and to URRWMO standards.
Nowthen PasturesProvide a 20-foot-wide trail easement along the west side of Nowthen Blvd NW and the south side of Norris Lake Road NW.
Nowthen PasturesEnsure every lot has a septic site available that complies with Minnesota Rules 7080.
Nowthen PasturesProvide a title commitment for City Attorney review before the final plat is released for recording.
Nowthen PasturesAny existing driveways and field entrances must be removed and the ditch section restored to match existing depth, slope, and grades.
Nowthen PasturesBefore the financial security can be released, the applicant must complete the items required by the Development Agreement.
Nowthen PasturesNo other access points onto CSAH 24 or CSAH 5 will be permitted for this plat beyond the proposed new residential access points.
Nowthen PasturesProvide a 20-foot-wide trail easement on the south side of Norris Lake Road NW and the west side of Nowthen Blvd NW.
Nowthen PasturesThe project must dedicate trail easements within or adjacent to the subdivision, and it is recommended that a 20-foot-wide trail easement be provided along each adjacent County road.
Nowthen PasturesAny utility relocation within the CSAH 24 or CSAH 5 right-of-way must be coordinated directly by the city/developer.
Nowthen PasturesThe project must provide a wetland buffer consisting of an unmowed strip of land established with native vegetation adjacent to the delineated wetland.
Nowthen PasturesDedicate all public infrastructure or place it within a drainage and utility easement.
Nowthen PasturesThe driveway on CSAH 24 should be located within 30 feet of the west property line unless an engineering justification shows it cannot be located there.
Nowthen PasturesComply with (and incorporate) all comments in the listed City Engineer, Collaborative Planning, and Anoka County memos.
Nowthen PasturesFollow this resolution if it conflicts with the site plans unless modified by a final plat resolution.
Nowthen PasturesNo additional access points onto CSAH 24 or CSAH 5 are allowed beyond the proposed residential access points, and the right of access must be dedicated to Anoka County except for those access points.
Nowthen PasturesIf updated site plans require changes to lot lines/easements, incorporate them into the final plat; revise site plans/final plat as needed, and submit any required off-site easement document to the City before final plat recording release.
Nowthen PasturesRight of access along CSAH 24 and CSAH 5 must be dedicated to Anoka County, except for the proposed new residential access points.
Nowthen PasturesInternal site grading may not begin until ACHD engineering plan approvals are received and the applicable permits are issued.
Nowthen PasturesDo not begin clearing, grading, or other ground-disturbing work until applicable permits have been obtained.
Nowthen PasturesNowthen Pastures must establish vegetation and demarcate wetland buffers as the only required improvements.
Nowthen PasturesComplete infrastructure improvements on a schedule consistent with conditions in a Developer’s Agreement with the City.
Nowthen PasturesAny existing driveways and field entrances must be removed and the ditch section restored to match existing depth, slope, and grades.
Nowthen PasturesInternal site grading must not begin until ACHD engineering plan approvals are received and applicable permits can be issued.
Nowthen PasturesReimburse the City for all City and consultant costs related to review of the development plans and preparation of the Developer’s Agreement.
Nowthen PasturesInternal site grading cannot start until the requested ACHD engineering plan approvals are received and applicable permits are issued.
Nowthen PasturesPrivate signs, buildings, structures, plantings, berms, etc. outside the county right-of-way must be located so they do not create new sight obstructions along CSAH 24 and CSAH 5.
Nowthen PasturesComplete the items required by the Development Agreement before the City releases the financial security.
Nowthen PasturesHave the plans reviewed by the City’s septic consultant before the final plat is approved.
Nowthen PasturesThe project must dedicate an additional 10 feet of right-of-way along CSAH 24 (total 60 feet south of the CSAH 24 centerline) for future reconstruction.
Nowthen PasturesAny utility relocation within the CSAH 24 or CSAH 5 right-of-way must be coordinated directly by the city/developer.
Nowthen PasturesObtain and pay for all permits required by authorities having jurisdiction.
Nowthen PasturesThe driveway on CSAH 24 should be located within 30 feet of the west property lot line unless a justified engineering reason prevents it.
Nowthen PasturesAny City Council approval of the Nowthen Pastures Development Agreement would be subject to the City Attorney approving the final agreement.
Nowthen PasturesNo other access points onto CSAH 24 or CSAH 5 are allowed for this plat and the right of access along both roads must be dedicated to Anoka County except for the proposed new residential access points.
Nowthen PasturesBefore starting construction on the Nowthen Pastures subdivision, the developer must enter into a development agreement with the City.
Nowthen PasturesThe final plat, variance, and development agreement for Dryden Acres must comply with the conditions outlined in the attached Findings of Fact.
Dryden AcresThe amended CUP approval is subject to the conditions outlined in the attached Findings of Fact.
Dryden AcresThe project is approved with deferral of street construction requirements under the CUP.
Dryden AcresThe applicant must prepare and submit a Driveway Maintenance Agreement for City Attorney review defining who maintains the shared driveway between Lots 1, 2, and 3 of Dryden Acres.
Dryden AcresThe final plat cannot be approved until the Houghs deed the westerly 33 feet to provide the full 66-foot right-of-way width for Coquina Street NW.
Dryden AcresThe subdivision and access to CSAH 22 must be reviewed and approved by Anoka County.
Dryden AcresThe subdivision and access to CSAH 22 must be reviewed and approved by Anoka County.
Dryden AcresThe subdivision and access to CSAH 22 must be reviewed and approved by Anoka County.
Dryden AcresThe subdivision and access to CSAH 22 must be reviewed and approved by Anoka County.
Dryden AcresThe subdivision and access to CSAH 22 must be reviewed and approved by Anoka County.
Dryden AcresThe subdivision and access to CSAH 22 must be reviewed and approved by Anoka County.
Dryden AcresThe subdivision and access to CSAH 22 must be reviewed and approved by Anoka County.
Dryden AcresThe applicant must sign and record a Development Agreement that bars further subdivision until the street is built to full width, meets the City’s bituminous standards, and is accepted by the City, and must comply with the recorded agreement terms.
Dryden AcresA development agreement must be signed and recorded prohibiting further subdivision of the Dryden Acres lots until the public street is built to full width, meets the City’s bituminous road standards, and is accepted by the City, and the applicants must comply with the recorded agreement against all plat properties.
Dryden AcresDrainage/utility easements and buffers must be shown around all wetlands as required by law, and wetland buffer signs must be installed at the locations shown on the exhibit.
Dryden AcresDrainage/utility easements and buffers must be shown around all wetlands as required under state law, and wetland buffer signs must be installed at the locations shown on the exhibit.
Dryden AcresShow drainage/utility easements and buffers around all wetlands as required by state law and show wetland buffer signs at the intervals shown on the Preliminary Plat.
Dryden AcresDrainage/utility easements and buffers must be shown around all wetlands as required by state law, and wetland buffer signs must be installed at the locations shown on the exhibit.
Dryden AcresDrainage/utility easements and buffers must be shown around all wetlands as required under state law, and wetland buffer signs must be installed at the locations shown on the exhibit.
Dryden AcresDrainage/utility easements and buffers must be shown around all wetlands as required under state law, wetland buffer signs must be installed at the intervals shown on the Preliminary Plat, and wetland buffers shown on the survey must be established and maintained.
Dryden AcresWetland buffers shown on the survey must be established and maintained, no wetlands may be impacted during construction or grading, and unmowed buffer areas must be maintained with non-invasive vegetation.
Dryden AcresWetland buffers shown on the survey must be established and maintained, and no wetlands may be impacted during construction or grading.
Dryden AcresNo wetlands may be impacted during construction or grading activities, and adjacent unmowed buffer areas must be maintained with non-invasive vegetation.
Dryden Acres